I've seen a bunch of threads about date issues with campaigns, email marketing, project tasks etc and I'm having the same problem. When I create any of those items, the date reverts back to 1999-12-31.
I took my PROD setup, copied it to my local machine and the only difference I see is there is an "AM/PM" dropdown on the project task screen, but only a time text box on my prod server. In the case of email marketing, the example time in brackets is shown as "11:00pm" whereas my local copy of production files shows "23:00".
On the upgrade wizard page, I have an email template fix and 3.5.1d installed so the installs are identical (well, I did copy the files from production so I KNOW they're the same). The only difference in environments is my local box has PHP 5.0.4 and my prod server has 5.0.4-pl3-gentoo.
Does 3.5.1e address this or is there a setting to configure or date patch or something? I know it's gotta be something simple, I just don't know where to look.


LinkBack URL
About LinkBacks



Reply With Quote

Bookmarks