MySQL Version 4.1.12
Windows 2003 Web Edition
System Windows NT PLATO 5.2 build 3790
Build Date Jan 11 2006 16:35:21
Configure Command cscript /nologo configure.js "--enable-snapshot-build" "--with-gd=shared"
Server API Apache 2.0 Handler
Virtual Directory Support enabled
Configuration File (php.ini) Path C:\WINDOWS\php.ini
PHP API 20041225
PHP Extension 20050922
Zend Extension 220051025
Debug Build no
Thread Safety enabled
Zend Memory Manager enabled
IPv6 Support enabled
Registered PHP Streams php, file, http, ftp, compress.zlib
Registered Stream Socket Transports tcp, udp
Registered Stream Filters convert.iconv.*, string.rot13, string.toupper, string.tolower, string.strip_tags, convert.*, zlib.*Hello:
Using 4.5.0h and my scheduler Last Run date always shows 01/01/2006 and the log entries show the same. This is on a Win2003 machine and I'm running the cron job once a minute via a Windows task. I have verified that the job is running correctly because my incoming messages are getted polled continually and placed in the sugar inboxes each minute. I have tried deleting all schedules and rebuilding the defaults. All four default schedules do the same thing. Have rebuilt all file relationships and run just about everything on the "repair" menu that seemed relevant.
I could have sworn this used to work but I could be wrong. It is possible that it quit working after I ran the Daylight Savings Time fix since it was after I ran it that I happened to notice the date issue.
Schedulers
Schedulers: Poll Email Inboxes
Job function pollMonitoredInboxes Status Active
Date & Time Start 01/01/2006 00:00 Active From Always
Date & Time End perpetual Active To Always
Last Successful Run 01/01/2000 00:00 Interval As often as possible.
Execute If Missed Never
Date Created: 12/29/2006 05:19 by mike Last Modified: 12/29/2006 14:54 by mike
ShowHide Job Log
Start Start Previous Previous (1 - 10 of 575) Next Next End End
Execute Time Status
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
01/01/2000 00:00 Completed
*
Following is a log entry showing the problem...
12/29/06 03:51:00,659 [2660] FATAL SugarCRM - -----> Scheduler got a bad execute time: [ 2000-01-01 06:00:00 GMT-0 ]
12/29/06 03:52:00,752 [2856] FATAL SugarCRM - -----> Scheduler got a bad execute time: [ 2000-01-01 06:00:00 GMT-0 ]
12/29/06 03:53:00,628 [3536] FATAL SugarCRM - -----> Scheduler got a bad execute time: [ 2000-01-01 06:00:00 GMT-0 ]
12/29/06 03:54:00,610 [1120] FATAL SugarCRM - -----> Scheduler got a bad execute time: [ 2000-01-01 06:00:00 GMT-0 ]
12/29/06 03:55:00,720 [892] FATAL SugarCRM - -----> Scheduler got a bad execute time: [ 2000-01-01 06:00:00 GMT-0 ]
12/29/06 03:55:31,380 [360] FATAL SugarCRM - Error fetching relationship from cache schedulers_created_by
12/29/06 03:55:31,382 [360] FATAL SugarCRM - Error fetching relationship from cache schedulers_modified_user_id
12/29/06 05:18:54,500 [360] FATAL SugarCRM - Error fetching relationship from cache schedulers_created_by
12/29/06 05:18:54,502 [360] FATAL SugarCRM - Error fetching relationship from cache schedulers_modified_user_id


LinkBack URL
About LinkBacks



Reply With Quote



Bookmarks