Hi,
I was wondering if I could set up a time based workflow with a field constraints. By this I mean for example a workflow that would trigger after 72 hours has elapsed on any task with a priority of high that has not had a status changed to "complete".
To give some background I basically want to be able to Loop tasks if the status has not been changed to Completed. I have other workflows automatically creating tasks for users with the status as "not started". If they do not get around to doing the task I would want it to repeat.
I have different time loops for different priorities. High 72hours, medium 96hours and low 1 week.
I hope this makes sense
Also I am running sugar professional Version 6.1.6 (Build 5860)